Commercial Gambling Management Commission of Cambodia
All Projects

Commercial Gambling Management Commission of Cambodia

Phnom Penh, Cambodia
Completed

Client

CGMC

Location

Phnom Penh, Cambodia

Timeline

JAN-2023 – DEC-2024

Built Area

18 floors | 6,955 m²

Project Story

From concept to delivery

Description

Construction of a modern 18-storey institutional headquarters featuring a reinforced-concrete structure, contemporary glass façade, integrated building systems, and advanced vertical transportation and safety facilities.

Objectives

The Commercial Gambling Management Commission of Cambodia Headquarters is an 18-storey modern office building with a total construction area of approximately 6,955 m². The project combines a deep reinforced-concrete foundation, efficient office spaces, modern architectural finishes, and fully integrated mechanical, electrical, communication, security, and fire-protection systems.

Design Concept

The building was designed to express professionalism, transparency, and institutional authority. Its contemporary glass façade maximizes natural light and creates a modern civic identity, while the terrace roof provides additional functional and architectural value.

The internal spaces support administrative offices, meeting rooms, public service areas, technical rooms, circulation zones, and supporting facilities. Three passenger elevators and one dedicated car elevator provide efficient movement throughout the building.

Scope of Work

Key responsibilities delivered by Kimmex.

  • Teleportation and fence work
  • Concrete reinforced concrete, 40m deep foundation
  • Modern building structure with glass walls and terrace roof
  • Generator, telephone, Ethernet, audio, air conditioning system work
  • Fire extinguishing system, BMS-3 elevators, 1 car elevator

Engineering Challenges & Solutions

Constructing an 18-storey building on a relatively compact site required careful coordination of foundation, structural, architectural, and building-services works. A reinforced-concrete foundation extending approximately 40 metres deep was implemented to provide the strength and stability required for the high-rise structure.

The glass façade, terrace roof, elevators, car lift, fire-protection system, air-conditioning, network infrastructure, and BMS required precise multidisciplinary coordination. KIM MEX applied structured construction planning, technical supervision, quality control, and system integration to reduce installation conflicts and deliver a safe, efficient, and modern institutional building.