Ministry of Interior Building Project
All Projects

Ministry of Interior Building Project

Preah Norodom Blvd, Sangkat Tonle Bassac, Khan Chamkarmon, Phnom Penh
Completed

Client

Ministry of Interior

Location

Preah Norodom Blvd, Sangkat Tonle Bassac, Khan Chamkarmon, Phnom Penh

Timeline

Nov 2021 - Jun 2023

Built Area

11 floors | 105,545 m²

Project Story

From concept to delivery

Description

Ministry of Interior Building Project is a Kimmex construction project for Ministry of Interior, located in Preah Norodom Blvd, Sangkat Tonle Bassac, Khan Chamkarmon, Phnom Penh.

The Background

The project was planned around the client requirements, site conditions, and construction schedule for Preah Norodom Blvd, Sangkat Tonle Bassac, Khan Chamkarmon, Phnom Penh.

  • Built area: 105,545 m²
  • Planned duration: 20 months

Objectives

  • Deliver the project scope with practical coordination between client, design, and site teams.
  • Maintain construction quality, schedule discipline, and safe site execution.
  • Provide a durable facility that supports the operational needs of Ministry of Interior.

Design Concept

The design and construction approach focused on institutional function, public access, and long-term durability. Kimmex aligned execution with the documented scale, location, and schedule requirements.

Scope of Work

Key responsibilities delivered by Kimmex.

  • Project owner: Ministry of Interior
  • Construction location: Preah Norodom Blvd, Sangkat Tonle Bassac, Khan Chamkarmon, Phnom Penh
  • Built area: 105,545 m²
  • Floors: 11 floors
  • Duration: 20 months
  • Bridge and fence work
  • Concrete type of reinforcement, foundation type of drilling, 40m deep
  • Classic building structure and tiled roof with 5 busbars
  • Generator, Telephone, Network system, audio, air conditioning system, Access control, fire alarm, PA system, CCTV system, security scan equipment and data center facility
  • Fire extinguishing system and BMS system
  • 11 elevators, 20 escalators

Engineering Challenges & Solutions

Kimmex managed construction execution through practical sequencing, site coordination, and quality checks across the project lifecycle.

The work required coordination of resources, materials, and schedule milestones to keep delivery aligned with client expectations.