NBFSA-I Non-Banking Financial Services Authority (NBFSA-II)
All Projects

NBFSA-I Non-Banking Financial Services Authority (NBFSA-II)

Building No. 168, Street 598, Sangkat Chrang Chamres 1, Khan Russey Keo, Phnom Penh
Ongoing

Client

NBFSA Non-Banking Financial Services Authority

Location

Building No. 168, Street 598, Sangkat Chrang Chamres 1, Khan Russey Keo, Phnom Penh

Timeline

Jan 2025 - Nov 2026

Built Area

14 floors | 6,900 m²

Project Story

From concept to delivery

Description

NBFSA-I Non-Banking Financial Services Authority Office Building is a Kimmex construction project for NBFSA Non-Banking Financial Services Authority, located in Building No. 168, Street 598, Sangkat Chrang Chamres 1, Khan Russey Keo, Phnom Penh.

The Background

The project was planned around the client requirements, site conditions, and construction schedule for Building No. 168, Street 598, Sangkat Chrang Chamres 1, Khan Russey Keo, Phnom Penh.

  • Built area: 6,900 m²
  • Planned duration: 23 months

Objectives

  • Deliver the project scope with practical coordination between client, design, and site teams.
  • Maintain construction quality, schedule discipline, and safe site execution.
  • Provide a durable facility that supports the operational needs of NBFSA Non-Banking Financial Services Authority.

Design Concept

The design and construction approach focused on institutional function, public access, and long-term durability. Kimmex aligned execution with the documented scale, location, and schedule requirements.

System: Water, electricity, air conditioning, network system, WiFi camera, security door, conference system and BMS system

Scope of Work

Key responsibilities delivered by Kimmex.

  • Project owner: NBFSA Non-Banking Financial Services Authority
  • Construction location: Building No. 168, Street 598, Sangkat Chrang Chamres 1, Khan Russey Keo, Phnom Penh
  • Built area: 6,900 m²
  • Floors: 14 floors
  • Duration: 23 months
  • Concrete reinforced concrete,Classic building structure
  • Water, electricity, air conditioning, network system,
  • WiFi camera, security door, conference system and BMS system
  • Fire extinguishing system, elevators, 1 service elevator

Engineering Challenges & Solutions

Kimmex managed construction execution through practical sequencing, site coordination, and quality checks across the project lifecycle.

The work required coordination of resources, materials, and schedule milestones to keep delivery aligned with client expectations.